The residence project, built by Buyukhanli GYO, has a transformer power of 1600kva, and the low current, low voltage, medium voltage complete electrical installation works were done by ADM Electric Engineering together with Anel Electric.
The residence project, built by Buyukhanli GYO, has a transformer power of 1600kva, and the low current, low voltage, medium voltage complete electrical installation works were done by ADM Electric Engineering together with Anel Electric.
Buyukhanli GYO
ISTANBUL - Besiktas
2011 - 2013